TANK CONTAINER POLYETHYLENE SUITABLE FOR CONTAINMENT OF DRINKING WATER AND LIQUID FOOD.
- UNDERGROUND
- NET CAPACITY 500 LITRE
- CM diameter 105 h. 77
- ALSO AVAILABLE VERSION FOR NON FOOD!
The containers of the special series "BUNKER", have been designed and manufactured with exceptional features:
• High mechanical strength:
The great thickness of the walls and the molecular distribution of the resins used very compact, allows its use in critical conditions of use.
• Long life:
The raw material (linear polyethylene) mass colored by extrusion and enriched with special additives gives our containers high resistance to thermal degradation
(-60 ° to + 80 ° C) and therefore a barrier to aging.
• Preparations of use:
1) Eye Bolts: standard for easy handling and positioning (to empty container) and for a possible anchor locking device;
2) manhole;
3) Tower extension (on request);
• Variety of use:
Source of drinking water for food.
Collecting rainwater.
Wastewater collection.
Storage of diesel and lubricating oils (for this use must be complied with provisions of the Fire Department, and the USLLaws in force).
MADE IN ITALY !!
INSTRUCTIONS FOR UNDERGROUND
Proper installation is essential for the success
dell'interro.
In any case, you need the assistance of a technician
advice that enabled the most appropriate choices in relation to the characteristics
soil, follow all stages of the transaction and releases
written report on what runs. That document should be
retained with the traceability code attached to the tank.
Without these documents the warranty offered by Telcom spa decade.
The digging Whereas, in addition to the size of the tank,
must be calculated more, on each side, a distance of
30 cm beyond the overall dimensions. The bottom of the excavation will allow perfect drainage,
to avoid causing the stagnation and accumulation of water.
For the realization of the excavation, observe the following rules of thumb:
a. land for non-bearing (soft ground)
consider that the angle of excavation can not be greater than 45 degrees
b. for soils with medium hardness not exceed 60 degrees
c. for excavations in rock can reach up to
80 degrees.
In the upper part, around the excavation,
must be left to a free zone of about
60 cm. width, to avoid the landslide
of the earth and to allow the movement of the
operators during trenching.